Dec. 6, 2005 issue

CAMPUS
SPAN: The 11-ton, steel truss
bridge that connects the new student
center to campus was installed Dec 2.
The bridge, which will include a 5 1/2-inch
concrete deck, is 68 feet long and 13
feet wide. The bridge, anchored to two
concrete abutments, spans the Owen 66-inch
storm drain and creates a straight north/south
pathway connecting the new student center
with the Parking Structure, Halle Library
and Mark Jefferson.
